FIRE DAMAGE PROJECTS

Engineering services for fire reinstatement projects, from the initial Make Safe assessment through to the final engineering design

Reinstatement of Commercial Building

Port Melbourne

Initial Make Safe reporting and preparation of Scope of Works for the fire damage reinstatement of a two-storied commercial building.

Reinstatement of Recycling Facility

Coolaroo

Initial Make Safe reporting, building condition reporting, and preparation of engineering design and documentation of the fire damage reinstatement of a steel-framed recycling facility.

Reinstatement of Warehouse Building

Brooklyn

Preparation of engineering design and documentation for the temporary propping and reinstatement of the structural steel framing to a fire damaged warehouse building.